VPI Posted March 24, 2021 Report Posted March 24, 2021 Starting a pair of bedside tables this morning. Solid Walnut with an open shelf with wireless charging and drawer for important stuff like zombie killing tools. Contemplating electronic locks on the drawers to keep the maids from trying to dust my zombie tools. Mostly a 22x18 marble shelf inset into the frame for top shelf and walnut carcass with some variant of mid-century modern legs. 6
Hennyo Posted March 25, 2021 Report Posted March 25, 2021 (edited) I have an EUVL F5X I recently acquired in need of help/work. I need to develop skills first. We have a fantastic "Interwest Electronics repair" but they're Booked!! EDIT: I Almost forgot a photo, attached for final edit. Just took it. And I repaired an old gifted coffee machine I got a couple of weeks ago. These things are too silly-fun Waiting for milk carafè in the mail. Bought the diffuser, milk carafè, and control boards, and I may need another piece. Gran Dama Avant couldn't be less my style tho. Also building an Über-amp courtesy of Soren_b in the next 5 weeks. Very busy with school until end of June, but will Squeeze the Uber amp in for certain... qnd I have a second cr2040 for the Set of Quads in the kitchen-lR. I need those tone controls badly. Eventually I'll modify the T1. I wanted to run multiple sets from the Realiser for company and my friend who lives with me... I'll be formally working in a plant or tooling facility by August for certain. Back to school in fall.. or something.. like online and auto didactic life plus my local group and lifelines to move forward. Will update with repaired Quads in a couple weeks, hopefully. Building a jig and will explain the reasoning for it. I want to determine resonance of each panel before finishing. Also considering custom panels made through Altium... which I have yet to learn for laughs.. I picked up the spare louvers already.. I am, my wallet is about broke! Back to work soon..! So far the 2x cheapie costco subs are not half bad... I daresay I am happy. Also painting the Yammy 1ks By two weeks from now 2! WiP'ogress, after this I need to focus on the automation technology program for a while.. I worked at autoliv for 8 months as a "Delivery guy" and all their machinery is custom. So I get some stuff... I worked the lines for about 2 or 3 weeks when they needed help. Their machine is also all Custom. Nothing is offshelf in that plant. I'm considering diamond coating and diamond-esq tooling production, if I turn out lucky enough to do that as it's only a few miles from the house. That was 10 years ago... but I am in a CoVid Relief Act Automation program at the school. For me it works. Edited March 25, 2021 by Hennyo
VPI Posted March 26, 2021 Report Posted March 26, 2021 Got to try Doug’s fancy drawer building joints and the micro adjuster from Jessem. Pretty easy way to put them together on the router table. Definitely easier than switching out blades and brakes on the SawStop. 8
VPI Posted March 27, 2021 Report Posted March 27, 2021 Glue Ups for the cabinet sides are coming along nicely. The Dominos really make it much easier. 7
swt61 Posted March 28, 2021 Report Posted March 28, 2021 That is a particularly tasty piece of Walnut. 1
VPI Posted March 28, 2021 Report Posted March 28, 2021 (edited) I am at the point now where I need to figure how to smash this stick pile into 12” legs. I am think an x brace across the bottom with the big piece with some half lap or whatever cuts in the middle and then splayed, tapered legs dominoed to the cross braces so coming out towards the corners. Hard to explain and even harder to draw up in Sketch Up so probably a disaster when I try to nail it all together. I was also trying to figure out how to mimic my actual mid-century modern dresser legs, but not sure a jig saw will get me far in making that setup. Edited March 28, 2021 by VPI 1
VPI Posted March 28, 2021 Report Posted March 28, 2021 (edited) Starting the remnant search for the tops. Edited March 28, 2021 by VPI 2
VPI Posted March 30, 2021 Report Posted March 30, 2021 In case anyone is paying attention, for legs I went with the simplest option and did tapered 1 1/2x2 sticks with the tiniest roundover. Going to do dominoes to connect these to the stretchers and then dominoes to attach to the bottom 3/4” Walnut base. 7
swt61 Posted March 30, 2021 Report Posted March 30, 2021 Cutting the bar that seats in a pass-through window, and finishing of shelves and bar. That's not even the good side of the bar. That's the bottom. 9
naamanf Posted March 30, 2021 Report Posted March 30, 2021 Coming along really nice, Jeff. Looking forward to seeing the finished product. Use the Osmo on those, Steve?
Icarium Posted March 30, 2021 Report Posted March 30, 2021 Love that glisten of some fine, freshly finished wood 😜
Voltron Posted March 30, 2021 Report Posted March 30, 2021 Osmo on the shelves but not on the bottom of the bar top. That is Le Tonkinois No. 1 linseed oil marine varnish. I prefer working with the Tonkinois but the finishes look similar. 2
VPI Posted March 31, 2021 Report Posted March 31, 2021 Do I need some Osmo? Those are some very sexy sticks Milo & Otis or whateverthefuckitis you guys call yourselves I ended up adding another taper on the rear face of each leg as they were just too beefy for the cabinets. 3
Voltron Posted March 31, 2021 Report Posted March 31, 2021 I still like Le Tonkinois No. 1 for a hard finish and Tried & True Original Wood Finish for a more natural low luster finish 3
VPI Posted March 31, 2021 Report Posted March 31, 2021 (edited) A question for the Festool geniusseses I am going to mount the legs to the stretchers with dominoes, but I want the stretchers set back from the edge of the legs. 1/8” on the side and 1/4” on the front/back. Is there a repeatable way to do this? Never mind, found a Sedge video where he does 10mm offset and it is good enough. Edited April 1, 2021 by VPI 3
VPI Posted April 4, 2021 Report Posted April 4, 2021 Today’s lesson learned is trying to glue up all three levels at the same time with limited work surface is not fun and leads to tons of glue cleanup. 3
VPI Posted April 24, 2021 Report Posted April 24, 2021 (edited) Finishing projects this weekend with drawer faces and pulls and BLO on the box joint box. I have also started hitting the online estate sales and getting some great deals on woodworking tools. I got the full set of Bow Clamps last night for $40, a 7x10 Wilton Wood Vice for $60 and a Leigh D4 Pro dovetail, finger joint tool for $120, all mint. Edited April 24, 2021 by VPI Because Brent Is an Asshole 11 2
swt61 Posted April 24, 2021 Report Posted April 24, 2021 That is gorgeous Jeff! And that's a crazy good price on the Leigh dovetail tool!
swt61 Posted April 24, 2021 Report Posted April 24, 2021 (edited) As for me, Milo and I finished our kitchen remodel April 13th. Edited April 24, 2021 by swt61 14
swt61 Posted April 24, 2021 Report Posted April 24, 2021 Also, got my Fitzcraft SSiPod and cables just before the meltdown, but didn't post quick enough. So freakin' awesome! 9 1
naamanf Posted April 24, 2021 Report Posted April 24, 2021 That looks awesome, great job, Jeff! And another amazing job by the M&O team! One of these days I’ll work through my backorder of wings and make something cool . 1
swt61 Posted April 24, 2021 Report Posted April 24, 2021 You need to hire a couple of 18-20 year olds to do the tedious work. Then hire me to oversee the twinks... I mean crew.
naamanf Posted April 24, 2021 Report Posted April 24, 2021 15 minutes ago, swt61 said: You need to hire a couple of 18-20 year olds to do the tedious work. Then hire me to oversee the twinks... I mean crew. I’m don’t think the twink supply is all that good here, mostly your average fruit cake and occasional ding dong. 1 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now